Location:
Midland Basin, Texas
Fuel supply:
Wet field gas
Turbine installation time:
1 day
Reliability:
99+% mechanical uptime to date

Requirements: Operator required 10 MW of oil and gas production power generation and a clean alternative to approximately 40 diesel generators due to lack of access to utility power.

Solution: Due to the high BTU content of the field gas, two SMT-60 gas turbines, along with gas compressors and gas conditioning skids were provided.