Location:
West Texas
Fuel supply:
CNG
Turbine installation time:
2 day
Reliability:
99+% mechanical uptime to date

Requirements: Operator needed a solution to power a single fracking operation with up to 20+ MW transient load, while also decreasing emissions.

Solution: One 32MW GE TM-2500 gas turbine was provided. LCP also provided a custom distribution panel which powered all auxiliary operations.

Value: Our customer successfully displaced all diesel generation across their frac fleet and decreased emissions.